The freeze dryer turns on the right yellow main power switch to work

Shanghai Xinzhuang Instrument Co., Ltd. develops the LNB brand freeze dryer, which is energy-saving and environmentally friendly. Professional manufacturing is more secure and affordable. Shanghai Xinzhuang Instrument Co., Ltd. specializes in the production and sales of incubator series products. The company has a good market reputation, professional sales and technical service team, with many years of experience in the business incubator series, more information about incubator, please consult Shanghaiçš“Zhuang Instrument Co., Ltd.!
Operation steps: Before freeze-drying, place the prepared items in a low-temperature refrigerator or liquid nitrogen, so that the items are completely frozen in ice before they can be freeze-dried.
1. Startup operation 1. Connect the main power cord and turn on the yellow main power switch on the right. At this point, the "cold trap temperature" display window begins to display the temperature of the cold trap. 2. Press the "Refrigerator" switch and the pre-cooling time is not less than 30 minutes. 3. Press the “Vacuum Meter” switch and the vacuum will be displayed as “999”. 4. After the pre-cooling is finished, place the prepared items to be dried in a drying tray and cover the plexiglass cylinder. 5. Press the stainless steel tab on the quick inflation valve and after the click is heard, pull the quick inflation valve connector out to automatically seal. 6. Press the “vacuum pump” switch, the vacuum pump starts to work, and the vacuum shows “999” until 1000Pa or less to display the actual vacuum, and the freeze-drying process begins. Note: When the vacuum pump starts working, press down on the plexiglass cover for a while, which is good for sealing.

Second, the shutdown operation Insert the quick inflation valve connector into the quick inflation valve seat (the gland type needs to turn the handle clockwise before inflation to compress the stopper). At the same time, turn off the "vacuum pump" power switch to make the air slowly enter the cold trap; if it is necessary to fill the inert gas, connect the decompression conduit of the inert gas to the "inflator port". 2. Turn off the "vacuum meter", "refrigerator", if you do not need to unplug the power cord for a long time. 3. Lift the plexiglass cover, remove the item, store it, and finish the freeze-drying process. 4. After the ice in the cold trap is turned into water, the water needs to be discharged from the outlet of the quick inflation valve, and the operation is the same as the inflation. 5. Clean the water and impurities in the cold trap and properly maintain the equipment. When the vacuum pump is not in use, the exhaust nozzle should be covered to prevent dirt from entering.

Cork Globe

Cork Globe,Cork World Map,Cork World Globe,Cork Travel Globe

Ningbo Holly Arts & Crafts Co.,Ltd. , https://www.china-globes.com

This entry was posted in on